|
| 1. |  Model # 30XX Actual lead time is Stock to 4 weeks | | Ergonomically designed handles for operator comfort....Read More
|
$61.97
| Detail Box | Product Brochure (pdf)
Usually ships in 3 weeks |
|
| 2. |  Model # 86-1-2S Actual lead time is Stock to 4 weeks | | Provide the solution for trimming back the DuPont Kevlar that serves as the central strength member in optical fiber. Made of hot-forged, high-carbon steel for long life. Quick action spring response s...Read More
|
$37.97
| Detail Box
Usually ships in 3 weeks |
|
| 3. |  Model # AWXX Actual lead time is Stock to 4 weeks | | Bullet-shaped head grips conductor and supports insulation, for perfect conductor contact....Read More
|
$42.87
| Detail Box | Product Brochure (pdf)
In Stock |
|
| 4. |  Model # AWGXX Actual lead time is Stock to 4 weeks | | L-shaped head affords greater visibility and works well in tightly confined solder areas. Perfect conductor contact....Read More
|
$33.18
| Detail Box
Usually ships in 3 weeks |
|
| 5. |  Model # FS400 Actual lead time is Stock to 4 weeks | | FS400 Fiber-Safe Bifurcated Swipe, 10 swipes containing 99% isopropyl alcohol. Used for cleaning the fiber after stripping and before cleaver insertion. Provides a more convenient method of fiber and connecto...Read More
|
$20.92
| Detail Box
In Stock |
|
| 6. |  Model # PDB-110 Actual lead time is Stock to 4 weeks | | Replacement blade for 110/88-type block punch down tools. Use with PDT-1 punch down tool. Read More
|
$29.97
| Detail Box
Usually ships in 3 weeks |
|
| 7. |  Model # PDB-66 Actual lead time is Stock to 4 weeks | | Replacement blades for 66-type punch down tool. Use with PDT-1 punch down tool. Read More
|
$26.97
| Detail Box
Usually ships in 3 weeks |
|
| 8. |  Model # 925C Actual lead time is Stock to 4 weeks | | Cable splicing scissors used with 19 and 23 AWG wire....Read More
|
$26.25
| Detail Box
Usually ships in 3 weeks |
|
| 9. |  Model # CK6 Actual lead time is Stock to 4 weeks | | 6.25" long cable splicer's knife. Read More
|
$17.48
| Detail Box | Product Brochure (pdf)
In Stock |
|
| 10. |  Model # CS-30-W Actual lead time is Stock to 4 weeks | | Housed in a rugged, anodized aluminum casing 112mm long and 25mm in diameter, the CS-30-W fits comfortably in either hand and in your pocket or tool kit....Read More
|
$55.97 ON SALE NOW!
| Detail Box | Info Center | Product Brochure (pdf)
Regular Price: $62.37
You Save: $6.40 (10%)
In Stock |
|
| 11. |  Model # DS-60-C Actual lead time is Stock to 4 weeks | | Protective retractable barrel with pocket clip and a stainless steel mounted diamond tip in your choice of conical or wedge shapes....Read More
|
$67.50
| Detail Box | Info Center | Product Brochure (pdf)
In Stock |
|
| 12. |  Model # CS-30-DE Actual lead time is Stock to 4 weeks | | Reversible carbide blade edged on both ends to double the life on the tool....Read More
|
$59.97
| Detail Box | Product Brochure (pdf)
In Stock |
|
| 13. |  Model # 925CS-ERGO Actual lead time is Stock to 4 weeks | | Entirely new, ergonomic snip for linemen and installers. One blade features ergonomically shaped, cushioned palm rest and the other blade has the traditional ring bow. High-quality, precision-ground, cutlery-grade...Read More
|
$49.97
| Detail Box | Product Brochure (pdf)
In Stock |
|
| 14. |  Model # NN203KIT Actual lead time is Stock to 4 weeks | | Kit with three basic tools for fiber optic stripping. A vinyl case protects the tools and provides convenient safe storage....Read More
|
$142.96
| Detail Box
Usually ships in 3 weeks |
|
| 15. |  Model # 925C-KIT Actual lead time is Stock to 4 weeks | | Basic kit used for splicing fiber optic cable. Read More
|
$48.53
| Detail Box | Info Center | Product Brochure (pdf)
In Stock |
|
| 16. |  Model # F1000 Actual lead time is Stock to 4 weeks | | 25 lint-free wipes containing 99% isopropyl alcohol. Used for cleaning the fiber after stripping and before cleaver insertion. Also provides a more convenient method of fiber and connector end-face cleaning. Read More
|
$21.97
| Detail Box
In Stock |
|
| 17. |  Model # CC125 Actual lead time is Stock to 4 weeks | | Designed for use with mechanical splices, the newer "no polish connectors" and any other cleaves which require precise cleave lengths. Compatible with glass fibers with 125-micron nominal cladding diameters...Read More
|
$297.97
| Detail Box | Info Center | Product Brochure (pdf)
Usually ships in 3 weeks |
|
| 18. |  Model # PFAO Actual lead time is Stock to 4 weeks | | Aluminum oxide polishing films ensure the finest polish and performance for fiber optic connectors. For single mode PC, Super PC, Ultra PC, and Angle (APC) connectors, return loss performance will mee...Read More
|
$12.97
| Detail Box
Usually ships in 3 weeks |
|
| 19. |  Model # PK2000 Actual lead time is Stock to 4 weeks | | A complete fiber optic connector polishing kit. You can also obtain any one or more ot the products individually....Read More
|
$169.97
| Detail Box | Info Center | Product Brochure (pdf)
Usually ships in 2 weeks |
|
| 20. |  Model # FS700 Actual lead time is Stock to 4 weeks | | The neoprene 5-1/2" x 5-1/2" x 1/8" polishing pad provides a cushioned surface with a (60-70) durometer for those connectors requiring a softer polishing surface. Read More
|
$10.50
| Detail Box
In Stock |
|